Good work day in between family requirements. Have primed - 2 coats - the frame and rear brake parts:
Will let cure/harden until Sunday. Have a lot of the smaller bits ready and staged for paint. Will do the front fairing brown tomorrow:
My local vapour blasting guy wants me to CERAKOTE a part/piece as a show piece - mentioned I would when I do the frame/brake parts. All I have to do is spray, he'll have the piece ready to go. Thinking the barter system should work as I do have a couple of other pieces I'd like blasted for paint and coating such as the brake calipers.
When I took the lower side fairing air vents apart, noticed that each vane is numbered. Will look into this and refer to the service manuals to determine if there is a required way to install the vanes after cleaning. Don't believe there is but never know - Honda mystery to be solved.
When I took the lower side fairing air vents apart, noticed that each vane is numbered. Will look into this and refer to the service manuals to determine if there is a required way to install the vanes after cleaning. Don't believe there is but never know - Honda mystery to be solved.