- Joined
- Jan 27, 2013
- Messages
- 9,855
- Reaction score
- 34
- Location
- Brisbane Australia
- My Bike Models
- 1981 GL1100 “Rats Nest”
1998 GL1500c Val
1987 CBR1000f “The Pig”
1991 CBR1000f Red
After the Brisbane flooding in May we decided it was time to do some seriouse upgrades to the DD ( eg through lots of money into dirt). A mate had purchased a low hours 5 ton Komatsu zero swing excavator which came with 3 good buckets and a rock pick ($45k aud) to do some work on his property and pick up some work on the side.
32 hours later and hopefully we have a driveway that will have less issues in the future down pours.
Rubble drain across the driveway to eliminate this
32 hours later and hopefully we have a driveway that will have less issues in the future down pours.
Rubble drain across the driveway to eliminate this